A New Chapter for Cherished Homes
Our Redevelopment Process
1. Meetings & Presentations
Our journey begins with understanding the specific needs of the residents and conducting a detailed study of the plot. We then provide a comprehensive presentation that includes:
2. Final Plan & Sanctions
The project plan is refined based on member feedback to meet their expectations. A final draft is prepared, which includes:
This draft is shared with the committee for approval, followed by obtaining necessary sanctions from municipal/local authorities.
3. Shifting of Residents & Demolition
Once the commercial terms are finalized, residents are relocated to rented apartments. The existing structure is prepared for redevelopment, and construction begins in line with the approved plan.
4. Project Completion & Handover
After redevelopment, the newly constructed building undergoes thorough inspections for quality, finishing, and installations. Upon receiving occupation and completion certificates, the building is handed over to the residents, ensuring a seamless transition into their upgraded homes.
Documents Required for Redevelopment
To ensure a smooth redevelopment process, the following standard documents are necessary: